Sometimes our work is loud and central. Sometimes, it’s quiet and off to the side – helping a project get over the finish line without much fuss. Our recent involvement at the Escapade Silverstone development definitely falls into the latter category.
Escapade is a bold and impressive project: a series of luxury trackside residences at Silverstone Circuit designed with motorsport enthusiasts and investors in mind. It’s a beautifully executed architectural scheme, and while we can’t take any credit for the headline work, we were brought in to help solve a very specific, very practical challenge.
In the final days before handover, the interiors team needed to soften some of the harder surfaces in the residences without disrupting the design language. Our solution: canvas-textured wall graphics, printed and installed across 60 units in just five days.
We worked quickly and quietly alongside other finishing trades, integrating with the build schedule and ensuring everything was completed in time for handover. No disruption, no drama – just a clean, efficient delivery of a small but important detail.
If you ever need someone to help tie up loose ends on a branding or architectural surface package, that’s where we fit in. We print and install photo murals, wall branding, and architectural films across the UK – reliably, quickly, and without getting in the way.
Project: Escapade Silverstone
Client: Escapade Living
Location: Silverstone, UK
Sector: Hospitality , Residential , Architecture
Scope of Work
• Print and installation of canvas-textured wall graphics
• Coverage across 60 luxury residences
• All works completed within five days, just prior to final handover
• Coordination with on-site contractors and other finishing trades
Outcome
• Softened interior surfaces without altering architectural intent
• Delivered efficiently under tight time constraints
• Supported final project handover with minimal disruption
Services Provided
• Wall graphic production
• On-site installation
• Project coordination
• Architectural finishes
Installation Team
From Monday to Friday we had a minimum of five installers on the project with an addtional two installers on the last couple of days. Approximately a months worth of work installed in to hit the deadline of the Friday PM handover.
Print Media
Whilst the project was signed off earlier the bottle-neck was the print media, we had to wait for a large enough deliver into our suppliers from Europe. This meant that we also had to hire in a second printing machine for the project to ensure that we could process enough print in time.
Over 68 boxes of media were used on this project with 1.8 Kilometres of print through two machines that ran virtually non-stop for five days.